How it works

Four steps, one point of contact

We coordinate with your interior designer and electrician directly, so you are not the one relaying messages between trades.

01

Consult

45 minutes in the showroom or on site. We look at your floor plan, your routine and your budget, and tell you what is worth doing.

Free, no obligation

02

Design

A room-by-room plan: what goes where, which circuits need changing, and the automations that will run without you.

Drawings your electrician can work from

03

Install

We schedule around your renovation, coordinate directly with your interior designer and electrician, and commission everything on site.

Typically 1 to 3 days

04

Live with it

A walkthrough with everyone in the household, then a tune-up after a month once you know what you actually use.

Lifetime remote support included

When to start, if you are renovating

The window that decides what a smart home can do is the electrical first fix, typically two to three weeks into a renovation. Neutral wires at switch locations are pulled then at negligible extra cost. Once the walls are plastered, adding them means hacking.

If your renovation has already finished, that is not a problem. Where a wall box has no neutral wire, which is common in older flats, we use wireless switches that bind to the circuit instead, and the vast majority of installs need no hacking at all.

Who does what

Stage We handle You handle
Consult Reviewing your floor plan and telling you what is worth doing Bringing the floor plan and a sense of your budget
Design Room-by-room plan, circuit changes, automation logic, drawings Introducing us to your interior designer and electrician
Install Scheduling around your renovation, coordinating trades, commissioning on site Site access on the agreed days
Handover Walkthrough with the household, one hour of training, tune-up after a month Getting everyone who will use it into the walkthrough
After Lifetime remote support and warranty on parts and labour Telling us when something is not behaving

Common questions about the process

How long does the installation take?

Typically one to three days on site, scheduled around your renovation. The consultation before it takes about 45 minutes, and a tune-up follows roughly a month after handover.

When in my renovation should I contact you?

Before the electrical first fix, which is usually two to three weeks in. That is when neutral wires can be pulled at negligible cost. Earlier is better, because the design has to reach your electrician before the ceilings close.

Do you work with my interior designer and electrician?

Yes, directly. We issue drawings your electrician can work from and coordinate with your interior designer ourselves, so you are not relaying messages between trades.

Is the consultation really free?

Yes. 45 minutes at our Experience Centre in Tampines North or on site, with no obligation and no hard sell.

What happens after the system is installed?

A walkthrough with everyone in the household, an hour of handover training, and a tune-up about a month later once you know what you actually use. Remote support then continues for the life of the system.

Can you work on a home that already has a smart system?

Yes. Roughly one in three of our installs is a rescue job on someone else's system, so bringing an existing setup onto one hub is familiar work.

Start with the 45 minutes

Bring your floor plan to the Experience Centre in Tampines North and leave with a plan and a real number. By appointment, no obligation.